Running Umbraco 13? Security support ends 14 December. Fixed-price upgrade to 17: £8,999 + VAT See how it works →
simonantony
Upgrades and migrations

Will our website go down during an Umbraco upgrade?

The short answer

No. Our upgrades are designed for no downtime at cutover. The upgraded site is built and tested in a separate environment while your current site carries on serving visitors as normal. Nothing changes for your customers until the new version has been tested against your real content and integrations, and the switch itself is done without taking the site offline. Your team keeps editing content until an agreed point close to cutover, so there is no lengthy content freeze either. If your current agency has told you an upgrade means a weekend of maintenance pages, that is a choice about how they work, not a fact about Umbraco. Done properly, your visitors never know the upgrade happened.

This question usually comes from someone who has lived through a bad cutover: the maintenance page that stayed up all weekend, the missing content on Monday, the contact form that quietly stopped working. None of that is inherent to upgrading Umbraco. It is what happens when the upgrade is done in place, on the live site, under time pressure.

How we avoid downtime

We never upgrade a live site in place. The upgraded version is built in its own environment while your existing site keeps running untouched. That separation buys three things: unlimited time to test without risk, a like-for-like comparison against the live site page by page, and a cutover that is a controlled switch rather than a leap of faith. Because the new site is proven before it goes anywhere near your visitors, the switch itself involves no downtime.

What about our content

Content keeps flowing. Your editors work normally through almost all of the project. Close to cutover we agree a short window where changes are synchronised into the new environment, so nothing published during the upgrade is lost. This is a coordination detail most horror stories get wrong, and it costs nothing to get right if it is planned from day one.

What if something is wrong after the switch

Every upgrade includes 30 days of cover after go live. If anything surfaces in live use, from a styling quirk to an integration edge case, fixing it is part of the job, not a new invoice. And because the old environment is retained, there is always a way back while any issue is investigated, though in practice careful testing means the way back stays unused.

The full process, timeline and £8,999 plus VAT fixed price for Umbraco 13 to 17 are on our migrations and upgrades page. If a previous upgrade experience has made you cautious, we understand why, and we are happy to walk you through exactly how the cutover works before you commit to anything.

See our upgrade process →